The forward pass in project network calculations determines all of the following EXCEPT Free Multiple Choice Answer: Answer: D Bill is building a project network that involves testing a prototype.He must design the prototype (activity 1), build the prototype (activity 2), and test the prototype (activity 3).Activity 1 is the predecessor for activity 2 and activity 2 is the predecessor for activity 3.If the prototype fails testing, Bill must redesign the prototype; therefore, activity 3 is a predecessor for activity 1.This is an example of Free Multiple Choice Answer: Answer: B Which of the following represents an activity on an activity-on-node (AON)project network? Free Multiple Choice Answer: Answer: C A(n)_________ activity has more than one dependency arrow flowing from it. Multiple Choice Which of the following does NOT help describe a project network? Multiple Choice The critical path in a project network is the Multiple Choice When translated into a project network, a work package will become Multiple Choice The backward pass in project network calculations determines all of the following EXCEPT Multiple Choice Which of the following can be used without coordinating with managers of succeeding activities? Multiple Choice On a project network, the activity times are derived from the Multiple Choice Information to develop a project network is collected from the Multiple Choice Activities which can take place at the same time are termed Multiple Choice Which of the following correctly calculates the early finish for an activity? Multiple Choice A sequence of connected, dependent activities is termed a(n) Multiple Choice ________ activities must be completed immediately before a particular activity. Multiple Choice Which of the following is provided by both the project network and the work breakdown structure? Multiple Choice Arrows on an activity-on-node (AON)project network represent Multiple Choice Which of the following is NOT one of the basic rules to follow when developing project networks? Multiple Choice
An activity that has more than one dependency arrow flowing into it is termed a(n) Multiple Choice ________ activities are to be completed immediately following a particular activity. Multiple Choice Which of the following is not one of the basic rules to follow when developing project networks?Which of the following is NOT one of the basic rules to follow when developing project networks? Conditional statements are allowed but looping statements are not allowed.
Which of the following is provided by both the project at work and the work breakdown structure?The project network is a visual flow diagram of the sequence, interrelationships, dependencies and timing of all the activities that must be accomplished to complete the project. Both the WBS and the work packages will include the duration of the activity.
Which activities are to be completed immediately following a particular activity?Activities that must follow immediately after an activity are called successor activities. 3. Activities that can occur while an activity is take place is known as a concurrent or parallel relationship.
What sort of activity has more than one dependency arrow flowing from it?Burst Activity: an activity that has more than one activity immediately following it (more than one dependency arrow flowing from it).
|